Titans’ First Run a Success
Saturday, March 28th, 2009
Everybody seemed to have enjoyed our first practice along the banks of the Credit River last Thursday. The four of us had met after work at the top of Culham Trail, run about 4 km south and returned to the starting point. We followed the wavy route that included two pedestrian bridges, two road crossings, noticeable variations in the elevation and one steep climb on the way back. The surface was mostly gravel with the steeper slopes paved.
The weather was perfect. We’d met other groups engaged in running or walking, but the place was not as crowded as it would had been on a weekend. Tony and Mike enthusiastically run ahead without really knowing where they were going, but fortunately they got lost only for a moment. Sharon and I took it easy, enjoying it nevertheless. We are already planning how to get other folks at TD to join us, so we can form groups of a similar level of fitness to enjoy our running sessions even more. The empty trails are waiting.
More about the Culham Trail from the cyclist’s point of view: Credit River – Culham Trail.

Pictures to the right: Pedestrian bridge over the Credit River near Pinecliff Park at the end of Pine Cliff Drive.

